Any homeowner wants to buy high-quality and reliable equipment. And the first need to decide when choosing a gas boiler is its power. When selecting energy, it is usually based on the energy intensity value of the heating system. If the boiler is needed for heating and water, then it is recommended to choose a wall-mounted gas boiler. This option is inexpensive and easily assembled. You can prefer the outdoor unit if you don’t want to maintain it yearly. Unlike the wall gas boiler, this equipment is more expensive but does not require an annual inspection.
Regarding manufacturers’ companies, it is worth saying that today’s domestic aggregates are practically not inferior and sometimes exceed foreign analogs. In addition, it is much cheaper. In any case, the choice remains yours.
How To Install A Gas Boiler
Procedure for installation work:
You should start with preparing the place where the equipment will be installed. Remember that floor boilers weigh decently, so their base must be strong enough. It may even have to fill the table. The floor itself should be performed only from refractory materials. If this is not the case, then for the lining, it is necessary to install hollow blocks with a height of 110 mm, which then needs to be covered with sheet metal.
When installing boiler Installations in Ayr for example a gas boiler, it is necessary to consider that the distance between the unit itself and the wall must be at least 100-110 mm. The wall covering itself must be made of non-combustible materials. If necessary, it is permissible to move the unit closely. Only the wall, in this case, will need to be covered with refractory material. For this, a steel sheet is laid over the asbestos formation, which is at least 4 mm thick.
The insulation must overlap around the perimeter dimensions of the boiler shell at least 100 mm. The convex parts of the reinforcement must be from the wall at a distance of at least 1 m.
When the base is prepared, the equipment must be placed smaller on it. It is possible to check the construction level. If necessary, it is possible to place a solid non-combustible material for alignment under the legs of the unit.
After alignment, the boiler can be connected to the heating system and chimney. So that the heat exchanger is not clogged too quickly, the disc cleaning filter is mounted before entering the return road. If the boiler design is a double circuit, the unit must still be connected to a cold-water pipe.
Installing a gas boiler that, if necessary, could be easily dismantled is recommended. All subordinate pipelines must be fitted to shut-off valves. If the unit needs to be dismantled in the future, the valves are simply closed, and the water system plus heating is unnecessary.